Projects in this category involve auditing project such as road rehabilitation, bridge construction, emergency works, flood control structures, and building construction.
I6 – AUDITING OF VIA DABEIBA
The institutional project is overseen and evaluated, with a specific focus on preserving and restoring the national roadway. The primary objective is to diminish transit durations and enhance overall road safety. Notably, the project encompasses reinstating the subbase and granular base, applying asphalt layers, constructing concrete ditches, implementing signage, and executing hydraulic infrastructure.
I7 – AUDITING OF VIA PITALITO
The supervision and audit of the institutional project focused on the maintenance and recovery of the road is carried out, the aim is to reduce transit times, as well as increase road safety. Of great importance because it is a national road.
Recovery of subbase and granular base, asphalt layers, concrete ditches and signage, hydraulic works is carried out.
I8 – AUDITING OF LAS MINAS BRIDGE
The supervision and audit of the institutional project is carried out focused on
The construction of the Las Minas bridge on the San Roque La Paz highway. The layout, excavation, flooring, reinforcement of iron, formwork and concrete casting of the foundation, abutments, coves and in general of the infrastructure and superstructure of the bridge as well as the pertinent laboratory tests are carried out.
I10 – AUDITING OF VIA LA ESPAÑOLA
The supervision and audit of the institutional project focused on the maintenance and recovery of the road is carried out, the aim is to reduce transit times, as well as increase road safety. Of great importance because it is a national road.
Rehabilitation of granular base and subbase, milling, extension of asphalt layer. construction of gabion walls, concrete channels and gutters, as well as filters and sewers. Equipment such as milling machines, asphalt finisher, compactor and tire compactor were used.
I11 – AUDITING OF VIA EL BANCO
The supervision and audit of the institutional project focused on the maintenance and recovery of the road is carried out, the aim is to reduce transit times, as well as increase road safety. Of great importance because it is a national road.
Rehabilitation of granular base and subbase, milling, extension of asphalt layer. construction of gabion walls, concrete channels and gutters, as well as filters and sewers. Equipment such as milling machines, asphalt finisher, compactor and tire compactor were used.
I13 – AUDITING OF CAUCA RIVER WORKS
The supervision and intervention of the institutional project is carried out focused on avoiding and controlling floods caused by the Cauca River in winter. Reducing the risk of human, animal and crop losses, as well as the deterioration of the population’s infrastructure. Location of spurs, piling and welding of pipe with piling equipment, coating of structure with asphalt cement and filling of structure with fascias. Bathymetry and sonar equipment is used.
Rejection controls are carried out on the driving, welding and bracing of the structure.
I20 – AUDITING OF AEROPUERTO DEL CAFE
Project of great importance at a national level, since it is a work whose objective is the strategic location of the coffee airport for its economic tourism potential and social development.
The supervision and supervision of the project is carried out on an institutional basis for the different stages of this. Topography control, rockfill material selection, sub-base and base for the formation of embankments, laboratory tests for density control. Construction of drains, filters and retaining walls with reinforced concrete structures. Equipment is used with bulldozers, backhoes, loaders, vibratory compactors, dump trucks, motor graders.
I22 – AUDITING OF CAUCA RIVER WORKS
The institutional project is supervised and monitored, focused on preventing and controlling flooding caused by the Cauca River in winter. This reduces the risk of loss of life, animals and crops, as well as the deterioration of the population’s infrastructure. Piles are placed, pipes are driven and welded with piling equipment, and rings are placed to slide the panels. Bathymetry equipment and sonar are used.
Rejection controls are carried out on the driving, welding and bracing of the structure.
I24 – AUDITING OF WORKS IN THE FRIO RIVER
A project of great importance at a regional level of an institutional nature focused on the supervision and technical, administrative and financial oversight of protection and containment works to prevent and control flooding caused by the Frio River in the municipality of Chía, reducing the risk of crop loss, as well as the deterioration of the population’s infrastructure. The location of levees, spurs and gabion walls is done.
I-25 AUDITING OF BOGOTA RIVER WORKS
Cleaning and maintenance of hydraulic structures was carried out, concrete slabs were replaced, debris and garbage were removed from the beds of streams and canals. Cracks were sealed and structures were repaired.